We're Open
+44 7340 9595 39
+44 20 3239 6980

You are employed as a technologist in a busy architectural practice. Your practice is engaged in the design of a detached multi-st

Information



  • Post Date 2018-11-09T12:08:48+00:00
  • Post Category Research Paper Queries

No Plagiarism Guarantee - 100% Custom Written

Order Details

You are employed as a technologist in a busy architectural practice. Your practice is engaged in the design of a detached multi-storey eco hotel set in its own grounds located just outside Chester.

TASK:
You are employed as a technologist in a busy architectural practice. Your practice is engaged in the design of a detached multi-storey 
eco hotel set in its own grounds located just outside Chester.
 
Using the “Choosing by Advantages process” you are to evaluate options for the wall construction, the roof construction, the lighting 
system and the internal walls on the ground floor. In each case at least 4 options should be considered and compared. Alternative 
advantages in each case should be set out in tabular form.
Considerations should include but not be limited to health and safety considerations and potential lifecycle deflects. Sketches and
diagrams of the proposed solutions may also be provided. As part of the conclusion the recommended solution should be identified.

Price: £ 99

100% Plagiarism Free & Custom Written, Tailored to your instructions