We're Open
+44 7340 9595 39
+44 20 3239 6980

1.[Solved] Using budget data, how many Apple iPhone 4’s would have to have been completed for Danshui Plant No. 2 to break even?

  100% Pass and No Plagiarism Guaranteed

1.[Solved] Using budget data, how many Apple iPhone 4’s would have to have been completed for Danshui Plant No. 2 to break even?

Danshui Plant No. 2

In August 2010, Wentao Chen, manager of Danshui Plant No. 2 in southern China, was anxious. The plant was in the third month of a 12-month contract to assemble the Apple iPhone 4. The contract called for Danshui to assemble 2.4 million iPhones in the period between June 1, 2010, and May 31, 2011, but now in the third month of the contract, production was only 180,000 units per month. Chen called Jianye Ma, the plant controller, to request a summary of monthly operations for August as soon after the end of the month as possible. Danshui was a contract manufacturer that assembled electronic products for companies wishing to save labor costs by locating in southern China where semiskilled labor was available for less than one dollar an hour. Manufacturers like Danshui assembled parts in large plants using assembly line techniques according to specifications of the international companies that contracted with them for assembly and final testing. The largest contract manufacturer in China was Foxconn, a division of the Hon Hai Group of Taiwan, with more than 800,000 workers in China alone and contracts to supply Apple, Dell, and Hewlett Packard among others.

In expectation of high demand for the iPhone 4, Apple had contracted with Danshui to assemble iPhones in Plant No. 2, which had been assembling computer hard drives on a contract that was fulfilled at the end of May 2010. Although the assembly of hard drives was different than assembly of iPhones, Danshui was confident that its workers would adapt to the new assembly tasks and that it could hire and train the additional workers as needed. Chens job was to get Plant No. 2 up to speed to fulfill the Apple contract and earn a profit for Danshuis parent company, located in Hong Kong, China. Danshui Plant No. 2 was a profit center that was credited for each iPhone produced and shipped, and charged for parts, labor, overhead, and shipping. Because the contract was for a year, an annual budget was established soon after the iPhone contract was signed. This budget was divided by 12 to establish equal monthly budgets to which actual revenues and expenses could be compared. All budgeting and monthly reporting was done in U.S. dollars. As the plant manager, Wentao Chen was responsible for control of all costs in his plant. Materials, labor, and overhead were his responsibility. This was done to provide incentive to control all costs whether caused by use waste, damage, theft, or inefficiencies.

The August Report

On September 2, Chen arrived at his office and found a report on August operations. (See Exhibit 3). The controller, Jianye Ma, had attached a note which Chen read with interest. To: Wentao Chen From: Jianye Ma and Bingqian Li Date: September 1, 2010 Per your request we have compiled a preliminary report on August operations. At first glance, revenue was below budget, material usage seems good, and labor costs were above budget. In terms of plant profit, our budget was $100,000, but we actually had a loss of $672,000. The main reason for the shortfall may be that we have been unable to produce 200,000 iPhone 4 units in any of the three months we have been working on this contract. Our major obstacle is hiring enough qualified labor to get production up to 200,000 units per month. We cannot find people to hire, even though we have raised our factory wages by almost 30% since July. (A friend at Foxconn in Shenzhen told Li that they raised their starting pay by 35% since March, and they are building new plants elsewhere where unemployment is high.) In addition, we continue to have trouble with the Samsung flash memory installation. Unless these are handled very carefully, they can be damaged by heat during installation.

One thousand flash memories were damaged in August and had to be replaced after inspection. Samsung is aware of this problem and has begun to install a shield to prevent some of the damage; however, as a result, Samsung raised the price of each unit $2.00 starting in mid June. Fortunately, Apple raised our revenue recovery by an equal amount, so this should be neutral. We apparently had a favorable variance on flash memories and other parts. Li is uncomfortable with this report. She feels we should prepare a new budget showing what we would have spent using standard costs and a production volume of 180,000 units. She says that the current report (Exhibit 3) distorts how we did, and that until we prepare a flexible budget to compare our actual performance to that budget we run the risk of misinterpreting our performance. It will take Li a couple of days to prepare and evaluate a flexible budget because she is working on a tax report that is due September 7. I will talk with you next week once we receive the flexible budget from Li.

Required;

1. Using budget data, how many Apple iPhone 4s would have to have been completed for Danshui Plant No. 2 to break even?

2. Using budget data, what was the total expected cost per unit if all manufacturing and shipping overhead (both variable and fixed) were allocated to planned production? What was the actual cost per unit of production and shipping?;

3. Prepare a flexible budget for 180,000 iPhone 4s and calculate flexible budget variances using actual costs for August.

4. Estimate material price and usage for flash memories, labor rate and usage (efficiency) variances, and the overhead spending variance for August.

5. What are some strategies or decisions that Wentao Chen should consider in trying to solve the problems with the Apple iPhone 4 contract in the next nine months? How would these change the costs and profitability of Danshui Plant No. 2 and the iPhone 4 contract?

£199 for PhD Standard - No Plagiarism Guaranteed - Prepared for the final submission


100% Plagiarism Free & Custom Written,
Tailored to your instructions


International House, 12 Constance Street, London, United Kingdom,
E16 2DQ

UK Registered Company # 11483120


100% Pass Guarantee

STILL NOT CONVINCED?

View our samples written by our professional writers to let you comprehend how your work is going to look like. We have categorised this into 3 categories with a few different subject domains

View Our Samples

We offer a £ 2999

If your assignment is plagiarised, we will give you £ 2999 in compensation

Recent Updates

Details

  • Title: 1.[Solved] Using budget data, how many Apple iPhone 4’s would have to have been completed for Danshui Plant No. 2 to break even?
  • Price: £ 189
  • Post Date: 2023-08-04T07:57:20+00:00
  • Category: Coursework Queries
  • No Plagiarism Guarantee
  • 100% Custom Written

Customer Reviews

1.[Solved] Using budget data, how many Apple iPhone 4’s would have to have been completed for Danshui Plant No. 2 to break even? 1.[Solved] Using budget data, how many Apple iPhone 4’s would have to have been completed for Danshui Plant No. 2 to break even?
Reviews: 5

A masterpiece of assignment by , written on 2020-03-12

CIPD assignment is not my cup of tea. That’s the reason I sought out this place suggested by my friend. I would say that the writers of this site are really admiring. I was assigned the best CIPD writer that solved all my issues. He explained to me the difficult topics so well that now I am able to talk on those topics eloquently. I owe my writer a huge thanks and praise! And yes, I would recommend other students as well to come to instaresearch.co.uk for the top CIPD assignment help.
Reviews: 5

A masterpiece of assignment by , written on 2020-03-12

The writer 0223 is really helpful. He gave me the best essay ever. Love you loads for such a great job and thanks again.