Task
There will be 1 online quiz on topics 1 to 2 due in the week 3 indicated below and the quiz will be uploaded on ‘Test Centre’ of Interact Site. Quiz will and comprise of multiple choices/statement completion questions.
Quiz (10%) – Topics 1, 2 – Week 3
Quiz consists of thirty multiple choice questions and you have 30 minutes to complete this test.
You can only attempt the test once. There are only four alternatives for each question and for each multiple-choice question select the best answer from the choices given. Your results will be automatically marked by the system.
Rationale
ITC505 201730 SM I-9 February 2017-Version 1
|
Page 6 of 19
|
This assessment task covers topics 1 to 2 and has been designed to ensure that you are engaging with the subject content on a regular basis. More specifically it seeks your ability to:
assess your knowledge of the basics of project management including project initiation and its relationship to strategic planning.
Marking criteria
|
CRITERIA
|
|
|
STANDARDS
|
|
|
|
HD
|
DI
|
CR
|
PS
|
FL
|
|
|
|
1. Knowledge
|
You are required
|
You are required to
|
You are required
|
You are required
|
You are required
|
|
and judgement
|
to attain a
|
attain a cumulative
|
to attain a
|
to attain a
|
to attain a
|
|
- multiple
|
cumulative mark
|
mark between 75%
|
cumulative mark
|
cumulative mark
|
cumulative mark
|
|
choice
|
between 85% -
|
- 84% to meet this
|
between 65% -
|
between 50% -
|
between 0% - 49%
|
|
questions. You
|
100% to meet this level. A mark in this 74% to meet this
|
64% to meet this
|
to meet this level.
|
|
are required to
|
level. A mark in
|
range indicates that
|
level. A mark in
|
level. A mark in
|
A mark in this
|
|
complete 20
|
this range
|
you have selected
|
this range
|
this range
|
range indicates
|
|
multiple choice indicates that you
|
the best answer
|
indicates that you
|
indicates that you
|
that you have
|
|
questions by
|
have selected the
|
option(s) from 4 or
|
have selected the
|
have selected the
|
selected the best
|
|
selecting the
|
best answer
|
more available
|
best answer
|
best answer
|
answer
|
|
most
|
option(s) from 4
|
choices for each
|
option(s) from 4
|
option(s) from 4
|
option(s) from 4 or
|
|
appropriate
|
or more available
|
question with no
|
or more available
|
or more available
|
more available
|
|
responses from
|
choices for each
|
more than 5
|
choices for each
|
choices for each
|
choices for less
|
|
a selection of 4
|
question with no
|
incorrect answers in question with no
|
question with no
|
than half of the
|
|
or more
|
more than 3
|
this
|
more than 7
|
more than 10
|
questions, with 11
|
|
choices.
|
incorrect answers
|
component of the
|
incorrect answers
|
incorrect answers
|
or more incorrect
|
|
Questions will
|
in this
|
examination.
|
in this
|
in this
|
answers in this
|
|
assess your
|
component of the
|
Overall, in meeting
|
component of the
|
component of the
|
component of the
|
|
knowledge in
|
examination.
|
this level you will
|
examination.
|
examination.
|
examination. At
|
|
project
|
Overall, in
|
demonstrate a
|
Overall, in
|
Overall, in
|
this level you will
|
|
initiation,
|
meeting this level comprehensive
|
meeting this level meeting this level not have
|
|
project
|
you will
|
knowledge in in
|
you will
|
you will
|
demonstrated a
|
|
planning,
|
demonstrate
|
project initiation,
|
demonstrate a
|
demonstrate a
|
basic knowledge in
|
|
project work
|
exceptional
|
project planning,
|
sound knowledge
|
basic knowledge
|
in project
|
|
breakdown
|
knowledge in in
|
project work
|
in in project
|
in in project
|
initiation, project
|
|
structures and
|
project initiation,
|
breakdown
|
initiation, project
|
initiation, project
|
planning, project
|
|
scheduling.
|
project planning,
|
structures and
|
planning, project
|
planning, project
|
work breakdown
|
|
|
project work
|
scheduling.
|
work breakdown
|
work breakdown
|
structures and
|
|
|
breakdown
|
|
structures and
|
structures and
|
scheduling.
|
|
|
structures and
|
|
scheduling.
|
scheduling.
|
|
|
|
scheduling.
|
|
|
|
|